VVVF & UPS UPGRADE
BHP - WHALEBACK

TECHNICAL SERVICES - COMMISSIONING SUPPORT

CHALLENGE

BHP required the replacement of multiple end-of-life LV VVVF drives and UPS systems at Whaleback during a tightly constrained shutdown period. The work needed to be completed within a dynamic environment, with shifting deadlines and limited operational windows, leaving no room for delays or rework.

VVVF Replacement

SOLUTION

Eminence Energy were engaged for technical and commissioning support to BHP, overseeing the replacement of the VVVF drives and UPS units while coordinating with all contractors involved. Our team provided commissioning, testing, troubleshooting and completions support to ensure each system was installed correctly and met operational and compliance requirements before handover.

RESULTS

The upgrade was successfully delivered within the shutdown window, restoring reliability to critical electrical systems and ensuring seamless recommissioning. Through effective coordination and technical oversight, Eminence Energy helped minimise downtime, streamline execution, and ensure the site returned to full operational capability safely and effectively.

UPS Replacement
VVVF Replacement

Contact Us

Eminence Energy

4/80 Hasler Road

Osborne Park, WA, 6017

EC: 16774

ABN: 96 683 419 963​​​

  • Facebook
  • LinkedIn

© 2025 by Eminence Energy. All rights reserved.

bottom of page